- Admissions
-
Academics
- College of Arts & Sciences
- Pamplin School of Business Administration
- School of Education
- Donald P. Shiley School of Engineering
- School of Nursing
- Graduate School
- Library
- Provost
- Registrar
- Center for Entrepreneurship
- Garaventa Center
- Academic Advising
- Early Alert
- Fellowships & Grants
- Honors Program
- Majors & Minors
- Studies Abroad
- University Catalog: The Bulletin
- Air Force ROTC
- Army ROTC
-
Campus Life
- Arts & Culture
- Campus Ministry
- Counseling & Health Center
- Dining
- Housing & Residence Life
- International Student Services
- Moreau Center for Service & Leadership
- Portland, OR
- Public Safety
- Recreational Services
- Shepard Freshman Resource Center
- Student Activities
- Student Affairs
- Student Resources
- Sustainability
- Services
- Athletics
- About UP
- Facilities Planning & Construction
- Physical Plant, MSC 13
- 5000 N Willamette Blvd.
- Portland OR 97203
- 503-943-8874
- fpc@up.edu
Facilities Planning & Construction: Wilson Clark Memorial Library Renovation
The renovation of the Wilson Clark Memorial Library began in May 2012. The design includes a dramatic change of the entrance at the main quad. There is the addition of a stair tower that goes from basement to roof. All volumes will be in the basement in compact shelving which will increase the amount of usable square footage. The University is aiming for LEED silver including the use of energy efficient lighting and mechanical. There will be added natural lighting throughout with skylights and other openings. A new elevator will be installed and the roof will be white to reflect heat. Reuse of recycled materials including 800 yards of crushed concrete from the River Campus buildings add to the sustainability of the remodel. When the Library is complete on July 15, 2013, two floors will open 24 hours a day.
-